AKU Operation Theatres, Karachi

The project consisted of constructing 3 new operation theatres and ancillary spaces adjacent to existing theatres by converting other spaces available. FND was commissioned by Aga Khan Hospital to design the HVAC system for these theatres. The OTís are designed as a state of the art facility with Laminar Flow Ceilings, individual temperature and humidity control, HEPA filtration, positive pressurization, etc.

<< Previous project Next project >>